Legacy Projects and Upgrading to v9
  • 07 Aug 2024
  • 2 Minutes to read
  • Dark
    Light

Legacy Projects and Upgrading to v9

  • Dark
    Light

Article summary

Legacy Projects in v9 Overview 

There are many things to consider when upgrading to v9. Chief among them is what happens to the current Projects and how they can take advantage of all the features of ProjectHub without causing disruption. This article will discuss the best ways of handling moving Projects from an older environment to v9.

Upgrade Order

The recommended approach to upgrading environments and importing Legacy Projects is as follows:

1. Upgrade the Development Environment. The existing Projects will be accessible as Legacy Projects.

2. Convert the Legacy Projects into ProjectHub. If the Legacy Project has Subprojects, convert those first, then the main Legacy Project.

3. Upgrade the Repository Environment.

4. Check in the newly converted Projects to the Repository.

5. Upgrade the Production Environment.

6. Deploy the Converted Projects from Repository to Production. 

Following this path will remove the need from converting Legacy Projects in each environment.  

Legacy Projects

What happens to Legacy Projects after they are now in the newly upgraded v9 environment?

In many ways Legacy Projects behave the same way that they did in v8 or lower versions. The Project will still run normally, so there is no risk of business loss in the Production environment while the Legacy Project remains in an unconverted state.

Permissions also function exactly the same. However, end users are limited to the Public Folders of a Project. Your Folder tree may need to be modified and moved to the Public Folders for those users to access Assignments, Dashboards, etc.

The biggest limitation of a Legacy Project is that it cannot be deployed to another environment. So any work that is done to a Legacy Project on a Development Environment will not be able to move to a QA environment or to Production, until that Legacy Project has been converted to ProjectHub.

Once a Legacy Project is converted to ProjectHub it is removed from the Legacy Folder. 

There are no longer System Defaults for many elements. These are configured at the Project level. If you are using any kind of default settings, variable, etc, that impacts multiple Legacy Projects, it is strongly encouraged to make a separate ProjectHub that contains all of those elements. Then that ProjectHub can be used as a Dependency by other Projects.

Converting a Legacy Project to ProjectHub

Please see Projects Conversion article for more detail.

ProjectHub Names Cannot Be Changed

If you were unhappy with your Legacy Project name, the conversion process is the time to change it. 

The ProjectHub name cannot be changed in the future. Keep in mind that if there are a large number of Projects, naming them may be the best way of keeping them organized on the side Project menu.

There are two methods for converting Projects. 

  • Convert Legacy Project to New Project: This action is only available on the folders that are part of existing legacy Projects. This will convert the Legacy Project to the new Project, incorporating all associated entities into the new Project. The Project name cannot be changed with this method.

  • Move Folder to Project This action is available on all folders. This will move the folder to the specific Project.

Importing Legacy Projects

Because of the changes to Projects in v9, Projects from older versions that were exported as .decobj files (usually in .zip files) cannot be used directly to create a Project (such as by dragging them onto the Decisions screen). A Project must be created first and then the file can be imported through the menu options.

Projects created in v9 can be exported as .decobj and imported by dragging them onto the screen.

More Information:

For a hands-on demonstration, please view the following video:



Was this article helpful?