Using Location steps in Flow
  • 15 Jul 2022
  • 2 Minutes to read
  • Dark
    Light
  This documentation version is deprecated, please click here for the latest version.

Using Location steps in Flow

  • Dark
    Light

Article summary

Overview

Location steps are used to calculate date/time for only Business days. These steps exclude weekends and any holidays that are configured in the Locations entity folder. Users may use these steps for processes (i.e calculates dates for meetings, appointments, Due dates, etc ) that require calculating dates for only Business days. This Example will discuss two location steps.


Prerequisite
Before using the Business Time steps, users must configure the Location entity that will be used for the steps discussed in this tutorial.  Locations can be found under System>System Data>Locations. For information on configuring these settings please go to Configuring Locations.

 Compute Business Time For Location Step Example

This step calculates a business date. It will exclude any non-working days and holidays configured for the Location entity.

Navigate to a Designer Folder and create a Flow. Under the step tab search "compute Business Time for location". Drag and drop the step to the workspace.


Note

For this example, Location information for "Test Company" was created. The workday configuration for this company was only weekdays and NO Holidays.


Configuration

Select the step and navigate to the properties tab. Here various inputs are required. 

InputDescription
StartThis is the start date that is used for calculating the set amount of time.
Days, Hours, MinutesThese are the variables used to calculate the amount of time required by the user.
Location NameThis is the Location entity that the business day/holiday dates are configured. This entity determines which dates to exclude from the calculation.


For this example, we have the following configuration settings.

  • Start date: This is a constant variable set to the current date.
  • Days: In these examples, users will calculate 10 business days after the start date. 
  • Location Name: This example is using the test company location configuration information.

This Flow will output exactly 10 business days from the start date.

Testing

Click Debug on the top of the Flow Designer and debug the Flow. The start date was "2/4/2020". Ten business days from the start date is "02/18/2020. This Flow excluded two weekends(total of 4 days).


Get Business Days Between Dates For Location Step Example

This Step calculates a number that indicates the number of business dates between the Start Date and End Date. This calculation is based on the "working Day" and any Holidays that are configured for the selected Location Name (this will exclude any non-working days and holidays)

Navigate to a Designer Folder and Create a Flow. Under the step tab search "Get Business Days Between Dates For Location". Drag and drop the step to the workspace.

Configuration

Select the step and navigate to the properties tab. Here various inputs are required.

InputDescription 
EndThis the end date for the Date Range the business days will be calculated for.
Location NameThis is the Location entity that the business day/holiday dates are configured. This entity determines which dates to exclude from the calculation.
StartThis the Start Date for the Date Range the business days will be calculated for.

 


For this example, the inputs are as follow:

  • Start Date: constant date of 02/04/2020
  • Location Name: Test Company
  • End Date: 03/04/2020

Testing

Click Debug on the top of the Flow Designer and debug the Flow. The start date was "2/4/2020". The End date is "03/04/2020. The output is 21 business days between those two dates. Again, this calculation only excludes Weekends.


Note
Please view Using Locations Steps for Holiday dates article for an example of how Locations steps use Holiday dates configuration.