Step Details | |
| Introduced in Version | 4.0.0 |
| Modified in Version | 7.12.0 |
| Location | Data > Dates |
The Is Between step determines whether a specified date is between the First and End date.
Properties
Inputs
| Property | Description | Data Type |
|---|---|---|
| Date To Test | Date to check if it lies between the First and End Dates | DateTime |
| End Date | Allows the user to set the end date | DateTime |
| Start Date | Allows the user to set the start date | DateTime |
Related Information
Forum Posts:
Days Between Dates As Integer
Time Span Between Two Dates
Calculating Time Between Two Dates
